Heinrich-von-Kleist-Forum

Hamm, Germany, 2009

A completely normal task

  • Special frame with steel frame for additional sound insulation
  • Venetian blind guide integrated in natural stone reveal
  • Mullion-transom atrium façade 12m vertically spanned over wind load beams (load collectors)